PDA

View Full Version : Archived: Newprt Bridge (Sunrise) - Middlesbrough - December 2010



Horus-_-
18-04-2011, 06:01 PM
Newport Bridge (Sunrise) - Middlesbrough - December 2010

Newpoort Bridge

I know this has been done alot, but have'nt seen it done at Sunrise, iv been meaning to do this for sometime now but everytime i get up on weekend the weather has been against me, untill now

Opened to traffic on 28 February 1934 by the Duke of York, the Tees Newport Bridge spans the River Tees a short distance upriver from Middlesbrough Transporter Bridge, linking Middlesbrough with the borough of Stockton-on-Tees, England. Designed by Mott, Hay and Anderson and built by local company Dorman Long, who have also been responsible for such structures as the Tyne Bridge and Sydney Harbour Bridge, it was the first large vertical lift bridge in Britain. The bridge was opened by the Prince Albert, Duke of York (later King George VI).

Constructed around twin 182ft (55m) lifting towers, the 270ft (82m) bridge span, weighing 2,700 tonnes, could be lifted by the use of two 325 H.P. electric motors at 52ft per minute to a maximum height of 120ft (37m). In the event of motor failure a standby 450 H.P. petrol engine could be employed to move the bridge, but should both systems fail it was possible to raise or lower the span manually using a winch mechanism. It was estimated in 1963 by Mr R. Batty, long time Bridge Master at Newport Bridge, that "it would take 12 men eight hours" to complete the movement by hand.

Originally 12 men would have been employed to man the bridge around the clock, usually requiring four to drive it at any one time. This was accomplished from the oak-panelled winding house situated midway along the bridge span. During the 1940s and early 1950s this would occur up to twice a day with an average of 800 vessels per week passing under it,[3] however, as the number of ships needing to sail up to Stockton-on-Tees declined, so did the usage of the bridge.
Newport Bridge, Middlesbrough
With the central span raised to allow the fire boat through

Legal requirement to lift the bridge for shipping traffic was removed in 1989 after the repeal of a parliamentary act. Before mechanical decommissioning Mr Ian MacDonald who worked on the bridge from 1966, finally as Bridge Master, supervised the final lift on the 18th November 1990.

http://i1089.photobucket.com/albums/i344/horus19821/recovered047.jpg

http://i1089.photobucket.com/albums/i344/horus19821/phpe14QAP.jpg

http://i1089.photobucket.com/albums/i344/horus19821/NewportBridgeMiddlesbrough.jpg

1.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0018-2.jpg
2.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0001-2.jpg
3.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0004-1.jpg
4.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0006-1.jpg
5.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0009-2.jpg
6.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0012-1.jpg
7.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0014-2.jpg
8.
What we call the DooM Ladder.
http://i1089.photobucket.com/albums/i344/horus19821/IMG_0015-2.jpg

Unfortually i could'nt take any internal shots as this was a race against time, i did'nt fancy being met by the local police and spending Saterday in a cell

Hope you enjoyed